699 other permits filed recently
699 permits
Townhomes. 7 Lots, 2 stories, VB Construction, R3 Occupancy SPR-0023-2024; BLDR-046410-2025 Lot 59 S
Replacement of all floor and shower tile. Replacement of existing bathtub Replacement of shower
Remove and replace 12 windows and 1 door like for like no structural changes.
Attic finish. Complete the finish work in an existing walk up attic. Wall framing per plan and engin
B OCC 4762 SF BUILDING IS B OCC 2 STORY 2-B CONST 41640 SFhe project shall consist of a second-gene
In the existing sanctuary, we are installing motorized noncombustible curtains to section off servic
adding a tub shower combo to half bath
20'x20' Carport
Remove the existing fiberglass tub and convert to a tiled walk-in shower. Relocate the shower valve
Add shower in upstairs bath, replace vanity
Fire damage-zone-008704-2026: remove damaged wood trusses and replace along with plywood and shingl
Interior fit out of tenant suites 204 & 206 on 2nd floor. Approx. 2653 sq ft. B OCC 2-B CONST SPRINK
Vanguard Church 301 S. Swain St. Raleigh, NC 27601 Occupancy Assembly (A-3) Construction Type III-B
Building a prefabricated 10'x20' storage shed on treated steel frame foundation and leveled with con
Remove the existing bathtub in the existing primary bathroom and build a closet for a new stackable
New single family dwelling Georgetown Sub Lot 5 DEMO 055251-2025 / Issued 12/17/2025 Sealed Crawl Re
Remove closet wall to kitchen. Structural engineer (Stonewall) confirmed non-load bearing. Moving t