Demolition Permits in Austin, Texas
242 demolition permits filed recently
242 permits
Interior Non-Structural Demolition
Spec suite on level 6. Existing Break Room with updated finishes only. Renovating existing worksharing layout to become spec suite office space with conference room offices phone rooms and support spa...
Total Demo of SFR 5987 sqft circa 1964
Interior Non-Structural Demolition of Miscellaneous Accessories Walls and Cabinets
Total Demo of SFR 1248 sqft circa 1960
Demolition of Retail Building - includes 4 units approximately 1000 sq. ft. built circa 1950. 2026 009761 DA - Approved ...
Pool remodel one wall of existing pool to be demolished and replaced with new
Total demo of Detached garage 168 sqft
Demolition of a retail building approximately 7284 sq ft circa 1984. 2026 009678 DA - Approved ...
Spec suite on level 6. Existing Break Room with updated finishes only. Renovating existing worksharing layout to become spec suite office space with conference room offices phone rooms and support spa...
Spec suite on level 6. Existing Break Room with updated finishes only. Renovating existing worksharing layout to become spec suite office space with conference room offices phone rooms and support spa...
Spec suite on level 6. Existing Break Room with updated finishes only. Renovating existing worksharing layout to become spec suite office space with conference room offices phone rooms and support spa...
Spec suite on level 6. Existing Break Room with updated finishes only. Renovating existing worksharing layout to become spec suite office space with conference room offices phone rooms and support spa...
Total demo of Detached garage 495 sq ft circa 1938 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of th...
Total Demo of SFR 3538 sqft circa 1926
ePlan: Residential Expedited Review: Demolition of old pool & rebuild of new pool.
Total Demo of Pool
Interior demolition of existing gun shop. Demolition of second level and exterior storefront will require permanent structural shoring included in this permit.
Interior Non-Structural Demolition for Cath Lab #3 Floor 1
Total demo of SFR 768 sqft Circa 1952