HVAC Permits in Austin, Texas
2,079 hvac permits filed recently
2,079 permits
ePlan: Residential Expedited Review - New Two Story Duplex Unit B 1-story [1bath] with attached garage
Replacement of complete existing central heat and air system with or without duct work we are replacing heating and gas systems no duct work only swapping out the machines 2.5ton machine swap out
Interior remodel master bath-wider shampoo niche remove tub replace with new shower pan remove one closet wall to extend bathroom size and frame wall for closet 2 new shower fixture 2 GFCI outlet new...
Express: Replacement of existing doors and windows with new units of the same size and location replacement of damaged or deteriorated drywall as needed kitchen renovation including replacement of cab...
Replacement of complete existing central heat and air system with or without duct work Replacement of 4 ton system
Caprock S405 C Left New - 2 Story SFR w/ 5 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
CHANGE OF USE from Finance to Personal Improvement Service and First Time Tenant Finish Out. We will be framing walls inside adding electrical outlets adding some plumbing to make some showers as well...
Replacement of complete existing central heat and air system with or without duct work
New 1-story single family residence 3 bed/2 bath attached garage covered porch and patio
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
New construction of SFR with 4 bedroom and 2.5 bathrooms. attached garage.
Eisenhower S406 C Left New - 2 Story SFR w/ 5 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Replacement of HVAC Systems for Community Center
Existing space modifications for new RAD Fluoro machine and associated equipment
ePlan: Residential Expedited Review - New Two Story Duplex Unit A 2-story [4bed 2.5bath]
Replacement of complete existing central heat and air system with or without duct work 2 Ton Horizontal Heat Pump
Replacement of complete existing central heat and air system with or without duct work
Renovation of an employee work area within a freestanding ER. The total renovation area is 538 sqft. There is no change in use or occupant load.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work