15,670 recent building permits filed in Texas.
15,670 permits
Remove existing rotted timber steps and retaining walls. Replace wood steps with limestone steps and the timber walls with steel walls that will minimize the impacts to the existing slope through mini...
IR and Garage conversion - complete interor renovation with removal and relocation of interior walls. Exterior alterations to allow for the addition of new windows on the west (side) and south (rear)...
Replacement of complete existing central heat and air system with or without duct work
Total demo of SFR 875 sq ft circa 1952 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition...
***Emergency service replacement done on 2/24/26. ESPA is required-Hyatt*** A truck hit the service riser this will be an emergency repair.
Replacement of complete existing central heat and air system with or without duct work Thomas Talley: Replacement of a 5-Ton horizontal like-for-like gas system
Addition and remodel: Interior to be completely gutted. Some walls to be removed or relocated. All windows and doors to be replaced. Minor Electrical and Plumbing work. Replacing Roof. Exterior work i...
Replacement of an existing water heater new 40 gallon rheem natural gas tank water heater change out 2706 Silverway Drive Austin TX 78757
3302 S 5th St. - Install 65 LF of 6 PCV Wastewater line from ROW to existing Clean Out near house
Installing a new irrigation system
Replacement of complete existing central heat and air system with or without duct work
temporary tpole for new construction in Stoney Chase REF: 2026-016087-BP
Install 26 new doors with side-lites transoms and thresholds. Paint railings for existing hotel.
New construction of a 1-Story Single Family Res. [3 bed 2.5 bath] with Attached/Detached Garage covered patio.
Upgrading 200a panel only no meter
ETJ new service for SFR
We ran approximately 60 feet of 1-1/4 poly with riser to supply gas to an outdoor pool Heater. Prior to running gas we called Texas gas with a BTU count and was approved to tie in just after the meter...
Interior remodel to existing offices
Repair of broken subfloor sanitary sewer and repair of the exterior building clean-out. All work is sublfoor tunneling for access hanging the pipe for the repairs.
Replace sewer line
Texas has 11,556 active building permits in our database right now, with 3,833 new permits filed in just the last 30 days. That's steady work coming through the pipeline. Austin leads the state in permit volume, making it the best hunting ground for new leads. Electrical work dominates the permit types we're tracking, with 3,480 permits on file. Plumbing follows close behind at 3,183, and HVAC sits at 2,079. If you're a roofer, electrician, plumber, or HVAC contractor, there's material here to find qualified jobs. General contractors can source subcontractor opportunities across all trades. Permit data works because it shows you real construction activity before competitors hear about it through informal channels. When you search our database, you're looking at jobs that have already cleared the approval stage and are ready to move forward. That's the difference between chasing rumors and targeting confirmed work.
Start with permit data. Every new construction project requires permits before work begins, which means permit filings are your earliest indicator of upcoming jobs. Search our database by trade type, city, and filing date to see what's been approved recently. A contractor searching for electrical leads would filter for electrical permits filed in the last 30 days, then contact the property owner or general contractor listed on the permit. This gives you a 30 to 90-day head start before the job gets posted on bid boards or social media.
Austin is the most active market in our database with 11,556 permits on file. This reflects the city's continued growth and construction activity across residential and commercial sectors. When targeting leads in Texas, Austin should be your primary focus. However, permit activity varies by season and economic conditions, so checking our database monthly helps you track where activity is shifting. Some months you might see upticks in suburban areas as developers start new phases of larger projects.
Electrical permits lead at 3,480 on file, followed by plumbing at 3,183 and HVAC at 2,079. New construction permits account for 999 filings. For electricians, the volume is there. Plumbers have solid opportunity. HVAC contractors should have consistent leads, especially on larger projects that include mechanical systems. If you work one of these trades, permit data gives you a clearer picture of where the actual work is happening rather than waiting for word of mouth or hoping jobs come through your existing networks.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com