Washington Building Permits
1,562 recent building permits filed in Washington.
1,562 permits
Construct Interior only non-structural tenant improvement to existing office space subject to field inspection STFI.
Construct interior alterations to existing single family residence per STFI
composite re-roof with re-sheet. The existing roof is on shiplap
Earthquake retrofit plan set per SEHR
Construct new north one-family dwelling per plan. (Establish use as single family residence with detached accessory dwelling unit per land use code. Construct two new one-family dwellings per plan. Re...
Construct additions and alterations to existing single family residence subject to field inspection (STFI).
Demolish existing structures on vacant land per plan.
Construct interior alterations to convert one family dwelling to adult family home per plan.
Replace 20 windows like for like in existing single family residence. No size/structural changes per STFI
Construct alterations to existing one family dwelling at lower level per plan.
Roof Overlay of DuroTuff PVC and 1/4" Coverboard onto existing SBS roofing
Construct alterations to existing one family dwelling per plan.
Tenant improvement for offices (MangoApps) on 5th floor of existing commercial building per plan.
Tenant improvement for Installation of full-height demountable partitions and associated ceiling track system to deck above subject to field inspection STFI.
Construct alterations to existing bank building per plan.
Install temporary rooftop telecommunications installation to support increased network capacity for traffic public safety and event operations related to the 2026 FIFA World Cup in Seattle. Equipment...
We will be removing the current composition shingles. We will then plan to replace 4 sheets of the decking with new 1/2" cdx plywood. We will replace any sheeting if necessary. We will then install ne...
Construct NE one-family dwelling SFR C per plan. (Establish single family use per land use code. Construct (4) new one-family dwellings per plan. Review and processing for four records under 7104599-C...
Construct seismic retrofit to existing single family residence per Earthquake Home Retrofit plan set.
Demolish fire damaged one-family dwelling without basement per plan.