171,372 permits
Herewith filing for the installation of new sprinkler system.
Installation of temporary work platform per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Modify & covert exist.public bldg. into two family dwelling units. obtain new c of o.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live load 300psf.
Bellevue hospital is fitting out an existing 9th floor lab as new it/mdf room. room will be protected with a dedicated single interlocked electronic actuated sprinkler system, with a dedicated novac 1...
General construction work filed in conjunction with Alteration type 1 (no work) #: 123923068
Install (2) new hot water storage tanks
Convert 4 family residence into a single family residence. horizontal and vertical enlargement. - existing two story brick and wood joists to remain & be repai
Modification to Verizon site. Relocate 2 GPS antennas and 1 antenna. Replace 1 antenna, remove 1 antenna, replace 2 RRHs, remove 2 RRHs, install 4 RRHs, install 6 antennas, remove 1 cabinet, install n...
Facade and roof restoration as indicated on plans filed herewith. no change in use, egress or occupancy.
Sistering and reinforcement of existing floor/roof joists throughout, reframing of existing horizontal enlargement and new dunnage for new mechanical condensers on existing roof.
Plumbing and sprinkler filed in conjunction with main application # b00809534
Soe specifications filed in conjunction with nb application #x01218505-i1.
Proposed a semi-detached two-family dwelling unit building with two off-street parking spaces.
Purpose: new/replacement installation. vinyl/pvc fence - 6'-0' ' (height) x 186'-0' ' (length). location: rear and side fence.
Support of Excavation for retaining wall as indicated on plans
Proposed structural, foundation, and earth work for a semi-detached two-family dwelling unit building.
Construction work on the 17th floor (corridor/lobby/boardroom) as indicated on drawings.
Installation of Heavy-Duty Sidewalk Shed. No change in use, occupancy, or egress.
Pre-tenant work 27-29-- interior demolition and construction required for bathroom fitout as per plans filed herewith. no change to use, egress, or occupancy.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com