168,344 permits
Modifications to the existing HVAC system on the 14th & 15th floors (Apollo Global Management) as per plans. No change to use, egress or occupancy.
Alt-1 file to renovation existing one-family dwelling with horizontal and vertical extension
Alt-1 file to renovation existing one-family dwelling with horizontal and vertical extension
Submit temporary construction fence at open space, in conjunction with alt-co application #:b01357335-i1. no change in use, egress or occupancy.
Structural framing and stair opening, as per plans. No change to use, egress, or occupancy.
Alt-1 file to renovation existing one-family dwelling with horizontal and vertical extension
Interior Renovation of Apt. 12D at the 12th floor, including general construction work. No change to egress, use or occupancy. The proposed work has no effect on the structural stability of existing b...
sanitary and storm underground piping
Interior renovation as shown as plans filed herewith.
Herewith filing architectural work as per plans. no change in use, egress or occupancy
Subsequent filing structural plans in conjunction with alt-co job #q01306579-i1
Renovate 2 stores on the 1st floor and 2 apartments on the 2nd floor. No change to use, egress or occupancy.
Mechanical work associated with conversion of building into daycare facility
Interior renovation of existing commercial space unit# 800 on 8th floor. Work includes split type heatpump ac unit and installation of partition wall at unit# 800. No change in use,egress or certifica...
Restore fire damaged conditions in Apt 1B to prior legal condition. Resolve HPD vacate. No elective work. No change to use, occupancy, egress, layout, or ratings
Construction of steel dunnage framing for proposed roof top units. application filed in conjunction with m01260395-i1 (gc), m01327973-i1 (pl) and m01327873-s1 (ms).
Interior renovation of the school's lobby, gym and other accessory spaces. no change in zoning, occupancy or egress.
Mechanical work for office renovation for Cohen Milstein Toll on 21st marketing level (20th construction)
Installation of sidewalk shed to protect pedestrian from the facade repairs on the street facing facade.
Mechanical Work as shown on plans. No change to use, egress or occupancy.