Building Permits in ZIP 10001
Manhattan, NY — 1,056 permits filed recently
1,056 permits
Renovation of the existing 68th floor phase 2 of an existing building as per plans filed herewith. no change in use, egress, or occupancy.
Suspended scaffold for facade restoration as shown on plans
Install supported scaffold on the sidewalk shed in the front
Installation of non-load-bearing partitions as per plans. change of use, egress, and occupancy on l50 (construction 30)construction floors 30, 33 & 34 (tenant levels 50, 53 & 54).
Install 50 linear feet temp. construction fence
Modification of plumbing fixtures for new pantry on 5th floor as per plans. no change in use, egress or occupancy.
Install 50 linear feet temp. construction fence
Structural work for the renovation of the existing 68th floor phase 2 of an existing building as per plans filed herewith. no change in use, egress, or occupancy.
Install supported scaffold on the sidewalk shed in the front
Structural modifications on floors 2-7 and associated slab removals as per plans filed herewith. No changes in use, egress or occupancy.
Storage - removal and installation of sprinkler heads and related piping. installation of additonal standpipe main piping, riser and hose racks off existing standpipe water service.
Installation of non-load-bearing partitions as per plans. change of use, egress, and occupancy on l50 (construction 30)construction floors 30, 33 & 34 (tenant levels 50, 53 & 54).
Retail 2 - Structural work for lowering of floor slab, with replaced beams, framing and infilling .
Suspended scaffold for facade restoration as shown on plans
Modification of plumbing fixtures for new pantry on 5th floor as per plans. no change in use, egress or occupancy.
Filing for Limited Exterior Repairs; no change to use, egress or occupancy.
Suspended Scaffold for Inspection as Shown on Plans
Erect non-illuminated projection banner non-flashing, non advertising sign barney brown as per drawing file herewith.
Extension of passanger elevator #4 with two additional stops: oneat the 17th fl (construction) and one at the roof level. newassociated emr and access stairs. new vestibule and toilet roomwhitebox at...
Renovation of the existing 68th floor phase 2 of an existing building as per plans filed herewith. no change in use, egress, or occupancy.