Building Permits in ZIP 10001
Manhattan, NY — 1,048 permits filed recently
1,048 permits
Modification to existing plumbing systems and fixtures and sprinkler / standpipe systems and installation of new sprinkler heads as per plans filed herewith. 001, 005, 006, 008 C (10M). No change in u...
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 11th floor (suite 1103) as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 5th floor (suite 503 & 504) as per plans filed herewith. no change in use, egress, or occupancy.
Filing herewith mechanical plans to indicate mechanical ductwork as shown on plans. there will be no change of use, occupancy or egress under this application.
Addition of air curtain to existing hvac systems including ac unit, fans, duct heater, ductwork, accessories, etc.
Modification to existing plumbing systems and fixtures and sprinkler / standpipe systems and installation of new sprinkler heads as per plans filed herewith. 001, 005, 006, 008 C (10M). No change in u...
Full demolition to a four story building
Sever connection between apts 1a and 1b on the first floor and recreation rooms on the cellar level. at the cellar level create bicycle storage, accessoory tenants laundry room and accessory gym for b...
Sever connection between apts 1a and 1b on the first floor and recreation rooms on the cellar level. at the cellar level create bicycle storage, accessoory tenants laundry room and accessory gym for b...
Sever connection between apts 1a and 1b on the first floor and recreation rooms on the cellar level. at the cellar level create bicycle storage, accessoory tenants laundry room and accessory gym for b...
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 5th floor (suite 503 & 504) as per plans filed herewith. no change in use, egress, or occupancy.
CleanSpace to install a temporary exhibit within an existing exhibition building. CleanSpace Booth #2235 on LVL 3 / Exhibit Hall 3B for Interphex 2026. Scheduled construction 04/17 - 04/24. No change...
Modifications to the existing plumbing system in basement (Le Cafe) as per plans. No change to use, egress or occupancy.
Full demolition to a four story building
Addition of air curtain to existing hvac systems including ac unit, fans, duct heater, ductwork, accessories, etc.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 11th floor (suite 1103) as per plans filed herewith. no change in use, egress, or occupancy.
Filing herewith mechanical plans to indicate mechanical ductwork as shown on plans. there will be no change of use, occupancy or egress under this application.
Modification to existing plumbing systems and fixtures and sprinkler / standpipe systems and installation of new sprinkler heads as per plans filed herewith. 001, 005, 006, 008 C (10M). No change in u...
Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 12th and 14th floors as per plans filed herewith. no change in use, egress, or occupancy.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.