Building Permits in ZIP 10001
Manhattan, NY — 1,056 permits filed recently
1,056 permits
Filing for Facade repairs as per plans filed herewith. No change in use, egress, or occupancy.
Plumbing work on 1st floor as per plans filed herewith. No change in use, egress or occupancy
Filing for plumbing & sprinkler work related to interior alterations to existing Starbucks. Removal, Relocating & Installation of plumbing fixtures related piping. Relocation of sprinkler heads
Modifications to existing plumbing and sprinkler system. No change in use, egress, or occupancy.
Installation and use of temporary contractor's shed/field office as per plans filed herewith.
Sprinkler work as shown on plans. No change in use, egress or occupancy.
Demolish & addition of minor ductwork servicing wellness room as per plans filed herewith. no change in use, egress or occupancy.
Emergency work order (control #350415): emergency removal of temporary structure. platform and courts framing to remain as per plans.
Installation of a heavy duty sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Propose interior renovation of apartment#6h; no change to use, egress, or occupancy. no exterior work.
Erect non advertising illuminated sign on wall-UPS Store. No change of use, egress or occupancy
Hereby filing to remove, relocate, and install sprinkler heads with related piping for tenant modifications as shown on plans filed herewith.
Reface of existing non-illuminated non-advertising accessory wall sign permitted under job no: 121699885 - empire beauty school. no change of use, egress or occupancy.
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Interior Tenant Build-Out
Filing herewith plumbing plans. work to include plumbing work as shown on plans. there will be no change of use, occuancy or egress under this application.
Replacement of 166 ton capacity split system from floor 003 to floor 018, as well as a 25 ton cooling tower on the roof. no change to ergress, use, or occupancy.
Build out of office space at the 6th floor. No change to use, egress or occupancy.
Interior renovation at the third floor. remove the partition as the plan shown. convert factory use to office use at 3rd floor and obtain new c of o.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus DecolaNO QEWI: FACADE INSPECTION Design...