Building Permits in ZIP 10001
Manhattan, NY — 1,042 permits filed recently
1,042 permits
Interior renovation of existing commercial space unit# 800 on 8th floor. Work includes split type heatpump ac unit and installation of partition wall at unit# 800. No change in use,egress or certifica...
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy of the sidewalk shed at west 34th street,6th avenue, and west 33rd street elevations.
Suspended scaffold installation and use as per plans filed herewith.
Filing for obtaining certificate of compliance of existing a/c. no change of use, egress and occupancy.
Full demolition to a five story building
Use of chute at the time of full demolition in conjunction with the demo application
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Full demolition to a five story building
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Full demolition to a five story building
Filing for obtaining certificate of compliance of existing a/c. no change of use, egress and occupancy.
Use of chute at the time of full demolition in conjunction with the demo application
Modifications to the existing HVAC system on the 1st floor (Landlord Work) as per plans. No change to use, egress or occupancy.
Temporary structures for an event. To be removed at the end of the programing. No changes to existing structures, use or egress or historical fabric. Associated TPA M01311194.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes in the basement & Storefront (LL Work) as per plans. No change to use, egress or occupancy.
Interior soft demolition of existing store to include removal of existing partitions and mill work. No change to use, egress or occupancy.
Installation of temporary construction plywood fence as per plans during construction. no change in use, egress or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes in the basement & Storefront (LL Work) as per plans. No change to use, egress or occupancy.
Installation of temporary construction plywood fence as per plans during construction. no change in use, egress or occupancy.
Interior soft demolition of existing store to include removal of existing partitions and mill work. No change to use, egress or occupancy.