Building Permits in ZIP 10001
Manhattan, NY — 1,042 permits filed recently
1,042 permits
Filing for minor modification to plumbing system in relation to heating and cooling systems.
Structural work as shown on plans
Filing for minor modification to plumbing system in relation to heating and cooling systems.
Structural work as shown on plans
FIling herewith drawings showing replacement of plumbing fixtures in Apt 17A, as per plans submitted. No change in Use, Egress or Occupancy under this application.
Sprinkler modifications on floors 1-3 and Standpipe modifications on floors 1-2 as per plans filed herewith. No changes in use, egress or occupancy.
Plumbing/sprinkler filing as per plans. no change in use, egress or occupancy.
Modifications to existing PL system for new tenant space. No change in use, egress or occupancy.
Existing eating and drinking establishment seating layout will be revised to include induction units at each table, which are intended solely for warming pre-cooked food and not for cooking. No change...
Installation of a temporary work platform as per plans during general construction work. no change in use, egress or occupancy. work platform shall comply with 2022 nyc building code, chapter 33
install sink, cap and remove hand sink and floor sink, also, install water and sanitary piping (plumbing), also install 2 sprinkler heads at windows and relocate five sprinkler heads. no change in use...
Existing eating and drinking establishment seating layout will be revised to include induction units at each table, which are intended solely for warming pre-cooked food and not for cooking. No change...
Installation of a temporary work platform as per plans during general construction work. no change in use, egress or occupancy. work platform shall comply with 2022 nyc building code, chapter 33
Modifications to existing PL system for new tenant space. No change in use, egress or occupancy.
Plumbing/sprinkler filing as per plans. no change in use, egress or occupancy.
Plumbing and sprinkler work for an interior renovation to fit out an office space as per plans filed herewith. no change in use, egress or occupancy.
Herewith filing for interior renovation of 3rd - 5th floor as per plans filed herewith. no change in use, occupancy or egress.
Installation of new FHV cabinets as shown on plans. No change in use, egress or occupancy.
Modifications to existing SP system and related piping for new tenant space. No change in use, egress or occupancy.
Facade repairs as per plans filed herewith. no change, to use, egress or occupancy.