Building Permits in ZIP 10002
Manhattan, NY — 521 permits filed recently
521 permits
Convert 2nd & 3rd floor from commercial to residential and obtain new Certificate of Occupancy. No change to bulk
Renovation work on apt f1605 to include general construction work as indicated on plans filed herewith. no change in use, egress, or occupancy.
Bard College High School: Proposed abandonment of a section of back-pitched sanitary pipe and adding new sewage ejector pump on the First Floor.
Renovation work on apt f1605 to include general construction work as indicated on plans filed herewith. no change in use, egress, or occupancy.
Bard College High School: Proposed abandonment of a section of back-pitched sanitary pipe and adding new sewage ejector pump on the First Floor.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
This application is being filed for mechanical work at the subject premises, per plans submitted herewith in conjunction with alt1 job#m01218681. no change in use, egress and occupancy.
Recovery of main and bulkhead roofs, balcony repairs, brick replacement, pointing, sill replacement, shelf angle replacement, interior repairs/upgrade as per plans. no change in use, egress or occupan...
Recovery of main and bulkhead roofs, balcony repairs, brick replacement, pointing, sill replacement, shelf angle replacement, interior repairs/upgrade as per plans. no change in use, egress or occupan...
This application is being filed for mechanical work at the subject premises, per plans submitted herewith in conjunction with alt1 job#m01218681. no change in use, egress and occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Two new boilers and two new hot water heaters with associated ducts and piping.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Two new boilers and two new hot water heaters with associated ducts and piping.
Full demolition of 4 story building using mech means to assist
Connect replacement gas burner to existing gas piping. no change in use, occupancy or egress.
Proposed vertical extension of existing building as per plan, change of use from 2 to 8 dwelling. Obtain a new CO
Install replacement split heat pump system for existing elevator machine room as per plans. no change in use, egress or occupancy.
Installation of plumbing work on 4th and 5th floor as per the plan filed herewith. no change in use, occupancy or egress.