Building Permits in ZIP 10003
Manhattan, NY — 1,064 permits filed recently
1,064 permits
Installation of two new signs as per plan herewith. no change in use, egress or occupancy.
Legalize 2 low pressure boilers serving the 1st floor commercial space and the 1st floor residential apt. cap + remove boiler lpb-1 and remove from the required boiler inspection log. no change to use...
Herewith filing for mechancial ductwork modification as per plans. no change to use, egress or occupancy under this application.
Temporary standpipe installation in conjunction with NB Application #M01170336-I1
Herewith file structural plans for the new opening in the floor for the new stair and framing in Apt. 3/4N, on floors 3&4, filed in conjunction with general construction (total apt. square footage is...
Construction fence associated with storefront replacement.
Herewith filing for interior partitions and doors modification as per plans. no change touse, egress or occupancy under this application.
M040_Proposed work to provide ADA accessibility through new ADA compliant boys and girls restrooms, and accessible wooden steps for auditorium platform.
Filing application for minor alteration of an existing residential space on 1st floor & cellar apt# 3du. work involves erecting non-load bearing partitions, install new wood and ceramic tile on existi...
Filing facade work to the south and east facade and minor facade work on roof. no change to use, egress or occupancy.
Renovation of existing apartment on the 3rd& 4th floors. architectural, structural & plumbing . no change in use, egress, or occupancy work is proposed under this application. (total apt sf is 2300 ar...
Installation of new awnings as per plan herewith. no change in use, egress or occupancy.
Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy.
Replacing hvac in apt 5a. no change to use, occupancy or egress.
Erect iluminated accessory business wall sign on backer panel@ university place elevation as per drawing file herewith
Replace Mansard Windows Within Existing Framed Openings on Partial 11th Floor, Install Exterior Metal Siding, Repair/Replace Damaged Terracotta Blocks, Interior Demolition & Finish Work & Erect Tempor...
Installation of new Split HVAC and Ventilation equipment for an existing commercial space. No change of use, egress or occupancy under this application.
Erect non-illuminated accessory business blade sign @university place as per drawing file herewith.
Erect non-illuminated accessory business blade sign @university place as per drawing file herewith.
Replacing hvac in apt 5a. no change to use, occupancy or egress.