Building Permits in ZIP 10003
Manhattan, NY — 1,076 permits filed recently
1,076 permits
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Work includes per the filed plans remove and reinstall existing stone cladding and cover panels.
Installation of new sprinklers at new offices.
Renovate existing 1968-Code One-Family Residence. Includes new partitions, finishes, flooring, doors/casings, steam sauna, roof/exterior work, plumbing, HVAC, sprinkler, struct. No change to occupancy...
M040_Provide plumbing fixtures and associated piping for new ADA compliant boys and girls restroom. Provide (1) ADA compliant drinking fountain, (2) lavatories, (2) water closets, (1) student drinking...
installation of matt foundation for new elevator shaft
Interior alteration of apartment 9kl on the 9th floor including non-structural partition demolition, new partition work, and new finishes. no change to the use, egress, or occupancy.
Modification of existing sprinklers and addition of a second sprinkler control valve.
Installation of new sprinklers at new offices.
M040_Provide plumbing fixtures and associated piping for new ADA compliant boys and girls restroom. Provide (1) ADA compliant drinking fountain, (2) lavatories, (2) water closets, (1) student drinking...
Modification of existing sprinklers and addition of a second sprinkler control valve.
Renovate existing 1968-Code One-Family Residence. Includes new partitions, finishes, flooring, doors/casings, steam sauna, roof/exterior work, plumbing, HVAC, sprinkler, struct. No change to occupancy...
Facade work as per plans filed. no change to use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Interior alteration of apartment 9kl on the 9th floor including non-structural partition demolition, new partition work, and new finishes. no change to the use, egress, or occupancy.
installation of matt foundation for new elevator shaft
Work includes per the filed plans remove and reinstall existing stone cladding and cover panels.
Structural work filed in conjunction with alteration application for renovation of an existing penthouse. Work is limited to designing a roof opening and supporting a new stair.
Structural framing, cladding, and metal decking as per plans. no change to use egress or occupancy.
Filing for stucco and parapet repair as shown on drawings herewith. no change in use, egress or occupancy.