Building Permits in ZIP 10005
Manhattan, NY — 312 permits filed recently
312 permits
Pre-tenant work 27-29-- interior demolition and construction required for bathroom fitout as per plans filed herewith. no change to use, egress, or occupancy.
Pre-tenant work 27-29-- interior demolition and construction required for bathroom fitout as per plans filed herewith. no change to use, egress, or occupancy.
T-Mobile: Relocation of existing antenna sector and installation of kickbacks on the roof. All work is in compliance with TPPN 5/98. No change in use, egress or occupancy.
Installation of pipe scaffold stair tower as per plans. stair tower shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Overhead protection for occupants at courtyard.
Overhead protection for occupants at courtyard.
Installation of pipe scaffold stair tower as per plans. stair tower shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
T-Mobile: Relocation of existing antenna sector and installation of kickbacks on the roof. All work is in compliance with TPPN 5/98. No change in use, egress or occupancy.
Installation and use of temporary sidewalk shed equipment as per plans filed herewith. no change to use, egress or occupancy under this application.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 51st floor as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 51st floor as per plans filed herewith. no change in use, egress, or occupancy.
Installation and use of temporary sidewalk shed equipment as per plans filed herewith. no change to use, egress or occupancy under this application.
Installation and use of temporary suspended scaffold for facade inspection and repairs as per plans filed herewith. no change to use, egress, or occupancy under this application.
Installation and use of temporary suspended scaffold for facade inspection and repairs as per plans filed herewith. no change to use, egress, or occupancy under this application.
Installation of temporary material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Modification of existing sprinkler system no change in use, egress or occupancy. Renovation of existing of partial commercial floor with new plumbing fixtures as per drawings herein.
Modification of existing sprinkler system no change in use, egress or occupancy. Renovation of existing of partial commercial floor with new plumbing fixtures as per drawings herein.
Modification of existing sprinkler system no change in use, egress or occupancy. Renovation of existing of partial commercial floor with new plumbing fixtures as per drawings herein.
Installation of temporary material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporary construction fence as per plans. no change in use, egress or occupancy. fence to comply with 2022 nyc building code, chapter 33.