Building Permits in ZIP 10006
Manhattan, NY — 178 permits filed recently
178 permits
Installation of temporary work platform per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
North hoists-cars 1&2: equipment use: dual 7400# capacity personnel/material hoists during nb filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this...
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Structural modifications as shown on filed plans
Installation of temporary work platform per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
North hoists-cars 1&2: equipment use: dual 7400# capacity personnel/material hoists during nb filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this...
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Structural modifications as shown on filed plans
Installation of temporary roof protection per plan. no change in use, egress, or occupancy. the roof protection at neighbor roof at 109 washington street and 110 greenwich street.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed at washington street and carlisle street elevations..
Installation of temporary chimney protection per plan. no change in use, egress, or occupancy. the 4 chimneys rptoection on 109 washington st and 1 chimney protection on 110 greenwich st.
Modifications of the existing sprinkler system and installation of TCSP. No change in use, egress of occupancy.
Installation of temporary chimney protection per plan. no change in use, egress, or occupancy. the 4 chimneys rptoection on 109 washington st and 1 chimney protection on 110 greenwich st.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed at washington street and carlisle street elevations..
Installation of temporary roof protection per plan. no change in use, egress, or occupancy. the roof protection at neighbor roof at 109 washington street and 110 greenwich street.
Modifications of the existing sprinkler system and installation of TCSP. No change in use, egress of occupancy.
Plumbing work associated with the conversion of the building
Interior plumbing demolition work as shown on filed plans
Interior renovation and mechanical hood of for commercial kitchen at basement floor #c4, as per plan filed herewith. no change in use, egress or occupancy.
Install of temporary window protection per plan. no change in use, egress, or occupancy. the window protection on 4 windows on the s elev at 110 greenwich st and w elev 108 greenwich st, 14 windows on...