Building Permits in ZIP 10007
Manhattan, NY — 286 permits filed recently
286 permits
Removal of non-loadbearing interior partitions and finishes. No change to use, egress, or occupancy.
Temporary Installations to be used on a temporary event Survivor 50. All the Installations are to be removed upon completion of the event.
Mechanical modifications as per plans
Partial first floor: Minor demolition of partitions & finishes with installation of new walls, office storefronts; remove & replace bathroom walls/ceilings, floors & fixtures. Partial cellar floor: re...
Install (1) new gas fired direct vent fireplace with doublewall flue and horizontal powervent in conjunction with nb 122132110. no change in means of egress, use group or occupancy.
Temporary Installations to be used on a temporary event Survivor 50. All the Installations are to be removed upon completion of the event.
Mechanical modifications as per plans
Partial first floor: Minor demolition of partitions & finishes with installation of new walls, office storefronts; remove & replace bathroom walls/ceilings, floors & fixtures. Partial cellar floor: re...
Install (1) new gas fired direct vent fireplace with doublewall flue and horizontal powervent in conjunction with nb 122132110. no change in means of egress, use group or occupancy.
Sprinkler modifications taking place on 2nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Installation of temporary bleachers at Central Park West and 71st St.no alt to exist structures for Japan Day ParadeA TPA permit is not required. Producer is responsible to monitor site safety & imple...
Installation of temporary bleachers at Central Park West and 71st St.no alt to exist structures for Japan Day ParadeA TPA permit is not required. Producer is responsible to monitor site safety & imple...
Sprinkler modifications taking place on 2nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Full demolition to a five story building
Partial demolition means & methods in conjunction with alt1 job 123700628
Partial demolition means & methods in conjunction with alt1 job 123700628
Full demolition to a five story building
Installation of industrial rope access for facade inspections.
Surrogates Court, facade repairs: Facade stone crack/spall repair, exfoliation resurfacing& water mist cleaning. Installation of guard rails on roof. Replacement/resetting of slate shingles on mansard...
Installation of industrial rope access for facade inspections.