Building Permits in ZIP 10007
Manhattan, NY — 285 permits filed recently
285 permits
Installation of plumbing fixtures and associated piping as per plans submitted herewith. No change of use, occupancy or egress under this application
Sprinkler work as shown on plans submitted herewith. No changes to use occupancy or egress as of right.
Hvac work as shown on plans submitted herewith. no change to use, egrees, or occupancy as of right.
Structural Work as shown on plans submitted herewith. No change to use, egress or occupancy as of right.
INTERIOR RENOVATION AND CONVERSION OF OFFICE SPACE TO DAYCARE FACILITY. INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW FINISHES, NEW DOORS. INSTALLATION OF ASSOCIATED MECHANICAL EQUIPMENT TO ACCOMOD...
Plumbing work as shown on plans submitted herewith. No change to use, occupancy or egress as of right.
Filed in conjunction with paa doc. 23 to alt1 job no. 121830439 and change of use on cellar and sub cellar from mercantile to health & fitness assembly; partial demoltion and interior renovation as pe...
Sprinkler work on the 3rd floor in apartment 3a as per plans filed herewith. no change to use, egress, or occupancy.
Facade work - repairs as per plans -Install cast iron components. Install GFRC components. Brick Replacement. Windowsill Replacement. Window Lintel Replacement.
Facade work - repairs as per plans -Install cast iron components. Install GFRC components. Brick Replacement. Windowsill Replacement. Window Lintel Replacement.
Filed in conjunction with paa doc. 23 to alt1 job no. 121830439 and change of use on cellar and sub cellar from mercantile to health & fitness assembly; partial demoltion and interior renovation as pe...
Sprinkler work on the 3rd floor in apartment 3a as per plans filed herewith. no change to use, egress, or occupancy.
INTERIOR RENOVATION AND CONVERSION OF OFFICE SPACE TO DAYCARE FACILITY. INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW FINISHES, NEW DOORS. INSTALLATION OF ASSOCIATED MECHANICAL EQUIPMENT TO ACCOMOD...
Structural Work as shown on plans submitted herewith. No change to use, egress or occupancy as of right.
Hvac work as shown on plans submitted herewith. no change to use, egrees, or occupancy as of right.
Install domestic water booster pump system.
Modification of existing sprinkler system in cellar to accommodate new architectural layout.
Application filed for installation of temporary bleachers that will be set up on a city sidewalk on 5th avenue at 64th street for the temporary event, st. patrick's day parade. no change in use, egres...
Plumbing work on the 3rd floor in apartment 3a as per plans filed herewith. work includes removal, replacement, and install new plumbing fixtures. no change to use, egress, or occupancy.
Modification of existing sprinkler system in cellar to accommodate new architectural layout.