Building Permits in ZIP 10009
Manhattan, NY — 384 permits filed recently
384 permits
Perform mechanical work inconjunction with existing ug6 eating & drinking establishment renovation. install split system hvac unit and bathroom ventilation. no change to use,egress, occupancy or fire...
Erect, maintain & dismantle of scaffold for facade repairs per drawings attached herewith
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Filing herewith plumbing work for renovation of first floor per plans.
Filing herewith plumbing work for renovation of first floor per plans.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Install exterior non-illuminated wall sign (paulie gee's slice shop)
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
installation of new awning
Install exterior non-illuminated wall sign (slices & squares)
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Install exterior non-illuminated wall sign (paulie gee's slice shop)
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Install exterior non-illuminated wall sign (slices & squares)
Removal of existing Kitchen service sinks; Relocation of water closet and lavatory; Installation of a new WC & lavatory, and bar station hand sink
Removal of existing Kitchen service sinks; Relocation of water closet and lavatory; Installation of a new WC & lavatory, and bar station hand sink
Plumbing work includes removal of exisiting lavatory and Water closet; installation of new sinks, a dishwasher, new gas line.
Erect illuminated accessory business sign on wall for fire escape
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.