Building Permits in ZIP 10009
Manhattan, NY — 384 permits filed recently
384 permits
Installation of a temporary construction plywood fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Application filed for facade repairs as per drawings filed herewith. No change to use, egress or occupancy as a part of this application.
Installation of a temporary construction plywood fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Interior renovation of store (nail shop) at 001. work includes installation of non-bearing partitions, new service area (nail stations/pedicure), and misc. gc & hvac/ventilation work as per the plans...
Filing for structural work for installation of playground equipment and paving at Playground 12 as shown on drawings filed herewith. No change in use, egress or occupancy.
New non-load bearing partition, new counter, new stainless steel panels, plastering and painting. new hoods, ducts and exhaust at roof
Alteration of existing commercial space on ground floor to install/ and add a commercial Kitchen, Create access to adjacent commercial unit.
INSTALLATION OF NEW 8FT HIGH ALUMINUM FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
SITE YARD WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
INSTALLATION OF NEW 8FT HIGH ALUMINUM FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
Alteration of existing commercial space on ground floor to install/ and add a commercial Kitchen, Create access to adjacent commercial unit.
New non-load bearing partition, new counter, new stainless steel panels, plastering and painting. new hoods, ducts and exhaust at roof
SITE YARD WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
Repair of existing slabs, beams, and piers supporting ground floor
Installing a new hatch for access to a crawl space from the exterior of the building.
Installing a new hatch for access to a crawl space from the exterior of the building.
Repair of existing slabs, beams, and piers supporting ground floor
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Erect an illuminated sign on wall.not within view of arterial highway or public park 1/2 acre or more. no change in use, egress or occupancy.