Building Permits in ZIP 10010
Manhattan, NY — 679 permits filed recently
679 permits
Plumbing work in conjunctino with the interior renovation of apartment 10d located on the 10th floor. altering interior partitions within the existingresidential unit. no change in use, occupancy, or...
General construction for interior renovation of Apartment 9C on the 10th floor as shown on drawings filed herewith. No change in use, egress or occupancy.
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy. the pipe scaffold on broadway and 5th avenue elevation from the top of the sidewalk shed past the main roof...
Plumbing works in conjunction with Apartment (#2J) interior renovation. No change to use, egress, or occupancy.
Modifications to existing Sprinkler System as per plans filed herewith. No change in use, egress, or occupancy.
Herewith filing for removal of existing demising wall on the 1st floor as indicated on plans. No change in use, occupancy, or egress.
Minor partition modification in cellar, replace hvac units on first floor and add hood over new electric pizza ovens.; no change to occupancy use or egress under this application.
Mechanical work on the 7th floor as plans filed herewith. no change in use, egress or occupancy.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Plumbing work filed in conjunction with dob now gc. no change to use, occupancy or egress.
Non-structural interior demolition at existing 10th floor office space. remove existing floor finishes and non-load-bearing partitions. no change in use, egress, or occupancy.
Filing for limited FISP facade repairs at 4 Peter Cooper Road as shown on drawings filed herewith. No change in use, egress, or occupancy.
Filing for plumbing work associated with interior demo of 30th floor as per plans submitted herewith.
Structural work at existing first floor lobby: provide new wall opening and install new steel framing with base plate and post-installed adhesive anchors as per engineer's plans. no change to use, egr...
General construction from the 7th fl as plans filed herewith. no change in use, egress, or occupancy.
Structural work at existing first floor lobby: provide new wall opening and install new steel framing with base plate and post-installed adhesive anchors as per engineer's plans. no change to use, egr...
Filing for limited FISP facade repairs at 4 Peter Cooper Road as shown on drawings filed herewith. No change in use, egress, or occupancy.
Plumbing work filed in conjunction with dob now gc. no change to use, occupancy or egress.
Mechanical work on the 7th floor as plans filed herewith. no change in use, egress or occupancy.
General construction from the 7th fl as plans filed herewith. no change in use, egress, or occupancy.