Building Permits in ZIP 10010
Manhattan, NY — 677 permits filed recently
677 permits
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Modifications to existing 1st floor sprinkler system. no change to use, occupancy or egress
General construction from the 2nd thru the 4th floor as plans filed herewith. no change in use, egress, or occupancy.
Interior plumbing demolition at existing 10th floor office space. remove existing plumbing fixtures and piping as required. no change in use, egress or occupancy.
Subsequent filing for plumbing work at 1st floor. no change in use, egress, or occupancy.
Renovation of existing 1st floor commercial space and partial cellar with mechanical work. no change in use, egress, or occupancy.
Interior renovation with minor partition works and re-tile bathrooms wall and floor, replace existing carpet floor, and install smoke/carbon monoxide detectors for 9th floor unit 9g. no change of use,...
General construction modifications taking place on the facade as per drawings filed herewith. No change in use, egress or occupancy.
Modifications to existing 1st floor sprinkler system. no change to use, occupancy or egress
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Interior plumbing demolition at existing 10th floor office space. remove existing plumbing fixtures and piping as required. no change in use, egress or occupancy.
Subsequent filing for plumbing work at 1st floor. no change in use, egress, or occupancy.
Interior renovation with minor partition works and re-tile bathrooms wall and floor, replace existing carpet floor, and install smoke/carbon monoxide detectors for 9th floor unit 9g. no change of use,...
General construction from the 2nd thru the 4th floor as plans filed herewith. no change in use, egress, or occupancy.
Renovation of existing 1st floor commercial space and partial cellar with mechanical work. no change in use, egress, or occupancy.
Plumbing and Sprinkler work at the 3rd & 4th floors, as per plans. No change to use, egress or occupancy.
Non-structural interior demolition at existing 10th floor office space. remove existing floor finishes and non-load-bearing partitions. no change in use, egress, or occupancy.
Modification and installation of plumbing fixtures and providing new incoming domestic water service to support new programming of the space.
Minor interior renovation of the existing apartment# 8D on the 8th Floor. No change to use, egress or occupancy.
Plumbing and Sprinkler work at the 3rd & 4th floors, as per plans. No change to use, egress or occupancy.