Building Permits in ZIP 10010
Manhattan, NY — 683 permits filed recently
683 permits
Garage repairs as per plans submitted herewith. there is no change in use, egress or occupancy.
Garage repairs as per plans submitted herewith. there is no change in use, egress or occupancy.
Facade repairs for 13th floor setback conversion as per plans. No change to use, egress or occupancy.
Minor plumbing modifications for medical office on 7th fl. no change to use, egress or occupancy
Initial cd5: inspection & fisp repairs per plans no change in use egress or occupancy
Filing for Mechanical modifications as per plans filed herewith. No change in use, egress, or occupancy.
Installation of one (1) three ton mini-split air conditioning system and associated fan coilunits in apartment 9b. no change to use, egress or occupancy under this application
Sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.
Installation of hoist for facade repair & inspection.
Installation of one (1) three ton mini-split air conditioning system and associated fan coilunits in apartment 9b. no change to use, egress or occupancy under this application
Sprinkler work in conjunction with interior office renovation on the 9th floor as shown on plans filed herewith. no change in use, egress, or occupancy.
Installation of hoist for facade repair & inspection.
Sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.
Duct work for existing hvac system for medical office on 7th fl as per plans filed herewith. no change to use, egress or occupancy.
Interior renovation of medical office on 7th fl as per plans filed herewith. no change to use, egress or occupancy
Herewith Filing Modification to existing Mechanical System as per plans.
Removal and installation of sprinkler heads and related piping including TCSP loop for existing office suites. No change in use, egress or occupancy.
Replace existing pl fixtuers with new as per drawings. no change to use, occupancy or egress proposed under this application.
Mechanical work in conjunction with interior office renovation on the 9th floor as shown on plans filed herewith. no change in use, egress, or occupancy.
Plumbing work as shown on plans filed herewith. No change in use, egress or occupancy.