Building Permits in ZIP 10010
Manhattan, NY — 683 permits filed recently
683 permits
Filing for underground plumbing in conjunction with new building application M00951038-I1
Removing existing walk in cooler and associated evaporator andcondenser and installation of two (2) new walk in coolers with new evaporators andcondensing units on roof.
Installation of sprinkler heads as per plans filed herewith. No change to use, egress or occupancy.
Reconnect existing low pressure gas line. no change in means of egress use group or occupancy.
Removing existing walk in cooler and associated evaporator andcondenser and installation of two (2) new walk in coolers with new evaporators andcondensing units on roof.
Filing for underground plumbing in conjunction with new building application M00951038-I1
Installation of sprinkler heads as per plans filed herewith. No change to use, egress or occupancy.
Reconnect existing low pressure gas line. no change in means of egress use group or occupancy.
Renovation of exist. duplex lower and upper level penhouse appartment located on 10th and 11th floor. new finishes as per plans submitted. structural , plumbing , meachanical , sprinkler work filed un...
Filing to install 38 sprinkler heads on the 16 floor.
Modification and installation of plumbing fixtures and providing new incoming domestic water service to support new programming of the space.
Modification to existing VERIZON site on the roof. Replacement of (6) antennas, (6) RRH units and (1) equipment cabinet. Relocation of (3) antennas, (2) OVP's and (2) GPS units.
Application filed for Plumbing and Mechanical modifications/additions as per plans filed herewith.
Modifications to the existing sprinkler system on the 17th Floor (Tempus) as per plans. No change to use, egress or occupancy.
Sprinkler and Plumbing modifications taking place on the Cellar and 1st floors as per plans filed herewith. No change in use, egress or occupancy.
Plumbing work filed in conjunction with interior renovation. no change in use, egress or occupancy.
Application filed for Plumbing and Mechanical modifications/additions as per plans filed herewith.
Sprinkler and Plumbing modifications taking place on the Cellar and 1st floors as per plans filed herewith. No change in use, egress or occupancy.
Modification to existing VERIZON site on the roof. Replacement of (6) antennas, (6) RRH units and (1) equipment cabinet. Relocation of (3) antennas, (2) OVP's and (2) GPS units.
Renovation of exist. duplex lower and upper level penhouse appartment located on 10th and 11th floor. new finishes as per plans submitted. structural , plumbing , meachanical , sprinkler work filed un...