Building Permits in ZIP 10010
Manhattan, NY — 683 permits filed recently
683 permits
Installation of temporary construction fence as per plans during general construction work. no change in use, egress or occupancy. fence to comply with chapter 33 of nyc building code of 2022.
Sub-slab void filling and permeation grouting program. no change to use, egress, or occupancy.
Salomons-- mechanical modifications and installations for retail renovation as per plans filed.
Support of Excavation for new building filed under M00950138
Interior 1st floor renovation with selective demolition, new non-load-bearing partitions, new door installation, ceiling adjustments, and finish work as per the architect's plans. there is no change t...
Interior renovation on cellar floor for apt #gla. no chance of use, egress, or occupancy
Replacement of chiller and dedicated outside air unit.
Interior renovation of apartment 10d located on the 10th floor. altering interior partitions within the existingresidential unit. no change in use, occupancy, or egress.
Salomons-- mechanical modifications and installations for retail renovation as per plans filed.
Salomons-- general construction inclusive of partitions modifications as per plans filed herewith. no change to use, egress, or occupancy.
Interior 1st floor renovation with selective demolition, new non-load-bearing partitions, new door installation, ceiling adjustments, and finish work as per the architect's plans. there is no change t...
Support of Excavation for new building filed under M00950138
Replacement of chiller and dedicated outside air unit.
Interior renovation of apartment 10d located on the 10th floor. altering interior partitions within the existingresidential unit. no change in use, occupancy, or egress.
Selective interior demolition and construction work on the 9th floor. No change in use, egress, or occupancy.
Installation of temporary betamax hoist as per plans. no change in use, egress or occupancy.
Selective interior demolition and construction work on the 9th floor. No change in use, egress, or occupancy.
Installation of temporary betamax hoist as per plans. no change in use, egress or occupancy.
Renovation of # PHGC on 6th and 7th floor with partition work as per plan. No change in use, occupancy or exit.
Renovation of # PHGC on 6th and 7th floor with partition work as per plan. No change in use, occupancy or exit.