Building Permits in ZIP 10011
Manhattan, NY — 1,105 permits filed recently
1,105 permits
PROPOSED TO DO MINOR WORK IN CELLAR FLOOR. WORK TO INCLUDE REMOVAL OF INTERIOR NON-LOAD BEARING TO CURE VIOLATION # 35485319H & 39164771M. No change to egress or bulk.
Chapel & sacristy- removal and installation of interior partitions to reconfigure existing bathroom. no change in use, egress or occupancy. see comments.
Plumbing and sprinkler work for the fit out of an apartment as per plans filed herewith. no change in use, egress, oroccupancy
Filing for the installation of a temporary fire sprinkler system for daycare space in cellar and first floors as per plans filed herewith. no change in egress, use or occupancy.
Chapel & sacristy- removal and installation of interior partitions to reconfigure existing bathroom. no change in use, egress or occupancy. see comments.
Plumbing and sprinkler work for the fit out of an apartment as per plans filed herewith. no change in use, egress, oroccupancy
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Herewith filing a tenant fit out for Chase Bank. No change to use, egress or occupancy.
Herewith filing to modify the plumbing and sprinkler fixtures. No change to use, egress, or occupancy.
Installation and use of temporary knuckleboom as per plans filed herewith. no change in use egress, or occupancy.
Install HVAC unit for chase bank.
Erection of minor partitions, millwork, new lighting and new finishes throughout the cellar and 1st floor commerical space
Herewith filing a tenant fit out for Chase Bank. No change to use, egress or occupancy.
Install HVAC unit for chase bank.
Installation and use of temporary knuckleboom as per plans filed herewith. no change in use egress, or occupancy.
Herewith filing to modify the plumbing and sprinkler fixtures. No change to use, egress, or occupancy.
Sherred hall - facade restoration including localized brick and brownstone masonry repairs, fire escape paint maintenance, gutter, and leader maintenance, stained and leaded-glass window restoration....
Subsequent filing for plumbing work on cellar, 1st thru 3rd floors, in conjunction with alt1 application #m00814190-i1.
Plumbing work as shown on plans (Penthouse 26 / PH 26).
File for interior demolition only for a multi-story single family residential building. all interior non load-bearing partitions and elements to be removed as per demolition plans.