Building Permits in ZIP 10011
Manhattan, NY — 1,115 permits filed recently
1,115 permits
Plumbing work for eating and drinking establishment at first floor of existing 5-story with cellar building
Suspended Scaffold and hoist installation as per plans filed herewith.
Installation of pipe scaffolding and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applica...
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Propose interior renovation on 6th floor appartment, works includes minor partitions, andfinish works as per plan. no change in use, egress, and occupancy.
Facade repair, masonry and railing replacement, concrete patching, lintel replacement as per plans filed. No change in use egress of occupancy.
Interior renovation of existing retail space. new air distribution ducts per plan. no change in use, egress, or occupancy.
Addition of a dedicated reclamation room exhaust system as per plans filed herewith. No change in use, egress or occupancy under this application.
Partial interior renovation of unit THA at the first floor, installation of non-loadbearing partitions as shown in plans. No change to egress, use, or occupancy.
Suspended Scaffold and hoist installation as per plans filed herewith.
Facade repair, masonry and railing replacement, concrete patching, lintel replacement as per plans filed. No change in use egress of occupancy.
Plumbing work for eating and drinking establishment at first floor of existing 5-story with cellar building
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Propose interior renovation on 6th floor appartment, works includes minor partitions, andfinish works as per plan. no change in use, egress, and occupancy.
Temporary Installation in Auditorium at 3RD FL to be removed after event
Installation of eleven (11) replacement ductless split air-cooled ac systems in ten (10) elevator machine rooms (emr) on multiple roof levels as per plans. no change in use, egress or occupancy.
1.install domestic hot water heater system, domestic hot/cold system/piping, sanitary/vent piping, gas piping, and storm drainage system/piping. 2. install new ejector pumps for cellar and new elevato...
Installation of 20 heads at shared lobby space
Modification of existing plumbing system to accommodate new tenant floor plan and plumbing fixtures/equipment. no change to use, occupancy or egress
Installation of eleven (11) replacement ductless split air-cooled ac systems in ten (10) elevator machine rooms (emr) on multiple roof levels as per plans. no change in use, egress or occupancy.