Building Permits in ZIP 10011
Manhattan, NY — 1,106 permits filed recently
1,106 permits
Construction of steel dunnage framing for proposed roof top units. application filed in conjunction with m01260395-i1 (gc), m01327973-i1 (pl) and m01327873-s1 (ms).
Conversion of first and second floors from retail use to eating and drinking Occupancy Croup A-2 and obtaning Certifiacte of Occupancy for same.
Installation of mechanical duct work in commercial spaces on first and second floors and new roof top mechanical units on existing steel dunnage using existing rooftop penetrations. No change in occup...
modification to systems as required to accommodate new tenant fitout
Intallation of new steel members as required to infill opening with new metal deck at second floor and install new steel dunnage connected to existing steel dunnage and parapet at roof level. No chang...
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Temporary structures for an event Pier 59 Studios. Removed at the end of the programing. No changes to existing structures, use or egress.
Edson hall - facade restoration including localized brick and brownstone masonry repairs, minor roof maintenance, stained and leaded-glass window restoration. no change in use, egress or occupancy.
Dodge hall - facade restoration including localized brick and brownstone masonry repairs, minor roof maintenance, stained and leaded-glass window restoration. no change in use, egress or occupancy.
Propose new illuminated signages for existing commercial space. no change to use, egress or occupancy.
Masonry Facade repairs as per plans.No change to use, occupancy, or egress.
Lorillard hall - facade restoration including localized brick and brownstone masonry repairs, minor roof maintenance, stained and leaded-glass window restoration. no change in use, egress or occupancy...
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
General construction on the cellar, 1st to 4th floor and roof as plans filed herewith. no change in use, egress, or occupancy.
Temporary structures for IAC event programming in the multipurpose room. Removed at the end of the programing. No changes to existing structures, use or egress.
Plumbing work on the cellar level (Spear Street Capital) as indicated on drawings.
Install new mech & kitchen exhaust sys for exist. commercial space (eating & drinking establishment). app filed to address ecb 39167817m (wwp). app filed in conj w/m01260395-i1 (gc), m01327973-i1 (pl)...
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Lorillard hall - facade restoration including localized brick and brownstone masonry repairs, minor roof maintenance, stained and leaded-glass window restoration. no change in use, egress or occupancy...
Temporary structures for IAC event programming in the multipurpose room. Removed at the end of the programing. No changes to existing structures, use or egress.