Building Permits in ZIP 10011
Manhattan, NY — 1,105 permits filed recently
1,105 permits
Kohne hall - modification of plumbing piping.
Seabury hall - structural work including steel framing, slab on metal deck, and cmu walls to support a proposed elevator shaft and mechanical openings. additional work inthe attic includes metal grati...
Sherred hall - removal and installation of interior partitions and finishes. no change in use, egress or occupancy.
Interior renovation of (12th/penthouse flr.) apt. PH-H. Including refinishing kitchen & baths, minor non-loadbearing partitions relocation/replacement, doors & frames, replacement of millwork/cabinetr...
Replace an existing 30 ton rooftop ac unit with new, same location. no ductwork involved. no change in use, egress or occupancy.
Installation of 300psf sidewalk shed and overhead protection as per plans. all equipment shall comply with chapter #33 of the nyc building code 2022. no change in use, occupancy, or egress under this...
Subsequent filing for cooking equipment and plumbing installation in a restaurant. No change to the use, egress or occupancy.
Connect to existing gas piping for replacement boiler and gas burner as per plans. no change in use, egress or occupancy.
Hereby filing for the relocation and installation of plumbing fixtures. no change to use occupancy or egress.
Installation of temporary sprinkler loop
Seabury hall - removal and installation of interior partitons and finishes. new elevator shaft walls. no change in use, egress or occupancy.
Modify Existing Sprinkler system, remove heads and install heads as indicated on partial 12th floor. No change to egress, occupancy or use.
Installation of suspended scaffold for facade work or inspection.
Interior renovation of cellar & 1st floor lobby as per plans. no change in use, egress or occupancy.
Lorillard hall - removal and installation of interior partitions, flooring, and finishes. no change in use, egress or occupancy.
Installation of a temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Structural Framing for vault repairs as per plans filed herewith, No change to use, egress or occupancy
Chapel & sacristy - modification of hvac and installation of air handler.
Interior alterations to existing residential space to include conversion of a bedroom to a bathroom. no change to use, occupancy or egress
Installation of temporary sprinkler loop