Building Permits in ZIP 10011
Manhattan, NY — 1,105 permits filed recently
1,105 permits
Installation of suspended scaffolds for facade repair and inspection.
Plumbing work in conjunction with the interior renovation of apartment 2j located on the second floor. the gas meter at cellar shall be shut off by the utility company. no change in use, occupancy, or...
Replacement of lighting in existing ceilings as per drawings filed herewith. No change in use, egress, or occupancy.
Installation of suspended scaffolds for facade repair and inspection.
Portion of existing slab to be partially removed for new HSS installation, remove existing curb, new concrete flood curb, new CMU curb.
Interior alterations of existing 7th floor commercial office space to include non-load bearing demo, partition and finishes work. no change to use, occupancy or egress
Facade repairs as shown on plans
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the nyc code 2022, no changes in use egress or occupancy under this application.
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
General construction modifications taking place on the 3rd floor as per drawings filed herewith. no change in use, egress or occupancy.
Installation of new non-bearing partitions, new office front and doors, installation of new ceiling and finish as per drawings filed herewith. no change in use, egress or occupancy.
General construction modifications taking place on the 3rd floor as per drawings filed herewith. no change in use, egress or occupancy.
Installation of new non-bearing partitions, new office front and doors, installation of new ceiling and finish as per drawings filed herewith. no change in use, egress or occupancy.
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Interior renovation filed to combine apts 8l/s, 8m/s & 8n/s under tppn 3/97. no change in use, egress, or occupancy.
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the nyc code 2022, no changes in use egress or occupancy under this application.
General construction work for the fit out of an apartment as per plans filed herewith. no change in use, egress, oroccupancy.
General construction of tenant retail space including installation of non-load bearing partitions and related finishes. No change in use, egress or occupancy.
Demolition of existing plumbing piping and fixtures within the area of work and the floor below. Demolition of sprinkler main, branch piping, and heads within the area of work. Demolition of standpipe...
Demolition of existing plumbing piping and fixtures within the area of work and the floor below. Demolition of sprinkler main, branch piping, and heads within the area of work. Demolition of standpipe...