Building Permits in ZIP 10011
Manhattan, NY — 1,106 permits filed recently
1,106 permits
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Plumbing work filed in conjunction with the interior renovation of the commercial space as per plan. No change in use, egress, or occupancy under this application
Cycle 9b facade repair work in compliance with ll 11/98 as per plans filed.
Installation of new packaged rooftop emergency generator w/ integral fuel storage tank in this pre-1968 existing building. no change in use or egress.
New eating and drinking establishment. New non load-bearing partitions, int. finishes, soundproof ceiling, storefront framing. New mech & air conditioning/venting. New type 1 hood for kitchen on 1st f...
Demolition of non-load bearing paritions, intallation of new partitions, doors and finishes on the first (1st) floor, apt. 1ds as per plans. no change to use, egress or occupancy.
Modifications to the existing HVAC system on the cellar and 1st floors as per plans. No change to use, egress or occupancy.
modify floor layout to accommodate tenant fitout
Replacing new gas lines for each riser. No change to use, egress or occupancy.
Facade repairs as per plans filed herewith. no change to use, egress or occupancy.
Filing for plumbing modifications as per plans filed herewith. No change in use, egress, or occupancy.
Sidewalk shed installation as per plans filed herewith.
Modification of floor layout to accommodate new tenant
Add system for new program layout
Interior plumbing work in unit 6B, at 6th floor, associated w/ OT application M01351262-I1. No change in use, occupancy, or egress.
modify floor layout to accommodate tenant fitout
Modifications to the existing HVAC system on the cellar and 1st floors as per plans. No change to use, egress or occupancy.
Add system for new program layout
New eating and drinking establishment. New non load-bearing partitions, int. finishes, soundproof ceiling, storefront framing. New mech & air conditioning/venting. New type 1 hood for kitchen on 1st f...
Replacing new gas lines for each riser. No change to use, egress or occupancy.