Building Permits in ZIP 10012
Manhattan, NY — 715 permits filed recently
715 permits
Filing for exterior repairs on roof and all facades, including parapet reconstruction, facebrick replacement, repointing, lintel reconstruction, and fire escape member repairs. No change in use, egres...
Installation of sprinkler heads in unit #505; relocation of existing sprinkler heads and new heads and associated piping; no change to use, egress or occupancy.
General construction taking place on 1st and 2nd floors as per plans filed herewith. no change in use, egress, or occupancy.
Ground floor retail upgrades for alteration type 2. work limited to inside the demised premises only on approximately 1,100 gsf of impacted retail area. there shall be no change of use, no change of o...
Exterior facade repair of brick masonry, terra cotta, stone elements and selective replacement of fire rated windows. no change in use, egress, or occupancy.
General construction taking place on 1st and 2nd floors as per plans filed herewith. no change in use, egress, or occupancy.
Installation of sprinkler heads in unit #505; relocation of existing sprinkler heads and new heads and associated piping; no change to use, egress or occupancy.
Installation of plumbing fixtures in unit #505; no change to use, egress or occupancy.
Install new demising wall and toilet to divide retail space into two spaces. no change to use, egress or occupancy.
Filing for exterior repairs on roof and all facades, including parapet reconstruction, facebrick replacement, repointing, lintel reconstruction, and fire escape member repairs. No change in use, egres...
Minor structural repair/replacement at non-street facade. new openings/new lintels and skylights/framing. no change to use, egress nor occupancy.
Filing herewith general construction to include waterproofing and structural modifications as per plans.
Sprinkler work in conjunction with office renovation
Plumbing modifications taking place on 1st and 2nd floors as per plans filed herewith. no change in use, egress, or occupancy.
Interior renovation of apartment unit 4s, on 4th floor only, consisting of partitions, gwb, tile work and cosmetic finishes as indicated. no change to egress, occupancy or use
Plumbing modifications taking place on 1st and 2nd floors as per plans filed herewith. no change in use, egress, or occupancy.
Sprinkler work in conjunction with office renovation
Interior renovation of apartment unit 4s, on 4th floor only, consisting of partitions, gwb, tile work and cosmetic finishes as indicated. no change to egress, occupancy or use
Erect (1) illuminated accessory business wall sign & (1) illuminated d/f accessory blade sign for ray ban on lafayette street elevation.
Facade repairs: which include terra cotta stone replacement, stone repairs, masonry replacement. No change to use, egress or occupancy