Building Permits in ZIP 10012
Manhattan, NY — 715 permits filed recently
715 permits
Minor pl scope associated with apartment renovation.
Proposed sprinkler & standpipe work in conjunction to arch. designs, no change in use, egress and occupancy.
1st floor interior renovation. no change in use, occupancy, or egress under this application.
Proposed sprinkler & standpipe work in conjunction to arch. designs, no change in use, egress and occupancy.
Installation of temporary material hoist as per plans submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filing herewith general construction ton include interior renovation and minor demo of existing apartments as per plans.
Proposed sprinkler & standpipe work in conjunction to arch. designs, no change in use, egress and occupancy.
Filing herewith general construction ton include interior renovation and minor demo of existing apartments as per plans.
Installation of temporary material hoist as per plans submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
1st floor interior renovation. no change in use, occupancy, or egress under this application.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Herewith filing for removal of existing plumbing systems and fixtures and installation of new plumbing system and fixtures on cellar, 1st, 2nd, and Roof levels. No change in use, occupancy, or egress.
Herewith filing for removal of existing sprinkler systems throughout and installation of new sprinkler and temp loop systems on the cellar, 1st, 2nd floors. Removal and relocation of Siamese connectio...
Proposed renovation on5 th floor at apartment 5n
Interior Renovation work for apartment 121 at Cellar & First Floor. No change of use, occupancy or egress.
Herewith filing for removal of existing sprinkler systems throughout and installation of new sprinkler and temp loop systems on the cellar, 1st, 2nd floors. Removal and relocation of Siamese connectio...
Proposed renovation on5 th floor at apartment 5n
Renovation the apartment #1c on 1st floor of existing 6 story building. demolition and construction work as per plan. no change in egress, use, or occupancy.
Interior Renovation work for apartment 121 at Cellar & First Floor. No change of use, occupancy or egress.
General construction proposed in triplex unit #2A on the cellar, 1st, and 2nd floors. Subsequent plumbing application to be filed. All per submitted plans. No changes to use, egress, or occupancy.