Building Permits in ZIP 10012
Manhattan, NY — 709 permits filed recently
709 permits
Relocate and install plumbing fixtures in apartment 4R on the 4th floor. Plumbing work. No change in use, occupancy or egress
Fisp repairs to include brownstone replacement, brick replacement, brick repointing, window limit stop replacement, sill repair, lintel restoration. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live load 300psf.
Subsequent filing s1-gc filed herewith to provide as-built drawings on this alt-co app for renovations permitted under related apps. there is no change to schedule of occupancy as originally approved...
Mechanical work on 6th floor, mezzanine, penthouse and roof as per plans submitted herewith. No change in use, egress or occupancy.
Relocate and install plumbing fixtures in apartment 4R on the 4th floor. Plumbing work. No change in use, occupancy or egress
Plumbing work and sprinkler work for the renovation of an existing commercial building. install new kitchen equipment, bathroom and fixtures with piping. no change of iuse, egress or occupancy. instal...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live load 300psf.
Fisp repairs to include brownstone replacement, brick replacement, brick repointing, window limit stop replacement, sill repair, lintel restoration. no change in use, egress or occupancy.
Propose renovation of mercantile area: new finishes applied to existing partitions & new retail fixtures. no change in use, egress, or occupancy.
Installation of plumbing fixtures in conjunction with gc #m01326469-i1 as per the drawings filed herein.
General construction from the 3rd to the 5th floors as plans filed herewith. no change in use, egress, or occupancy.
Structural work on the 6th floor, mezzanine, penthouse and roof as per plans submitted herewith. No change in use, egress or occupancy.
Installation of new ductwork (~200lf) connected to existing ahu units within the space. installation of new outside air fan and electric air curtain at the entrance as per the drawings filed herein.
Suspended Scaffold for Exterior Work
Plumbing work from the 3rd to the 5th floor as plans filed herewith. no change in use, egress or occupancy.
Remove, relocate and install new plumbing fixtures and related piping.
Removal and installation of interior partitions. no change in use, egress, or occupancy.
Installation of new ductwork (~200lf) connected to existing ahu units within the space. installation of new outside air fan and electric air curtain at the entrance as per the drawings filed herein.
Suspended Scaffold for Exterior Work