Building Permits in ZIP 10012
Manhattan, NY — 715 permits filed recently
715 permits
Relocate and install sprinkler heads on the cellar level, 1st floor through 5th floor, and penthouse as per plans submitted herewith. There are no change to use, egress or occupancy.
Installation of a combined fire protection water service with domestic water takeoff, new sanitary, vent, domestic water, stormwater, and gas pipping appliances. No change to use, egress or occupancy...
Plumbing work to add new powder room to retail space. No change to use, egress or occupancy.
Interior renovation to convert to dwelling units & exterior facade restoration with new proposed storefront
Structural modifications including reinforcement of concrete girders. No changes in use, egress of occupancy.
Exterior facade repairs and restoration per plans filed. there is no change in occupancy use or egress
Proposed exterior facade restoration as per plans filed herewith. no change in use, egress or occupancy.
Proposed exterior facade restoration as per plans filed herewith. no change in use, egress or occupancy.
Structural modifications including reinforcement of concrete girders. No changes in use, egress of occupancy.
Exterior facade repairs and restoration per plans filed. there is no change in occupancy use or egress
Interior renovation to convert to dwelling units & exterior facade restoration with new proposed storefront
Mechanical work from the 3rd to the 5th floors as plans filed herewith. no change in use, egress, or occupancy.
Roof exterior mock-up proposed. no change to use, occupancy or egress.
Installation of a heavy duty sidewalk shed as per plans during general construction work. no change in use, egress or occupancy. sidewalk shed to comply with chapter 33 of nyc building code of 2022.
Horizontal enlargement of the first floor in the existing building. Change of use to storage in cellar and retail at 1st floor, and work on the second floor per plans. Rear wall work on FL 1 and 2.
Subsequent filing for plumbing work in conjunction with ot job#m01191665-i1. no change in use, egress, or occupancy.
Remove glass and mullions above doors to install taller entry doors. Retain sidelights, remove dividing mullions, and add taller glass panes. Install house number signage. Other storefront elements re...
6th floor office renovation as shown on the drawings filed herewith. No change in use, egress, or occupancy.
6th floor office renovation as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Remove glass and mullions above doors to install taller entry doors. Retain sidelights, remove dividing mullions, and add taller glass panes. Install house number signage. Other storefront elements re...