Building Permits in ZIP 10013
Manhattan, NY — 1,006 permits filed recently
1,006 permits
IRA to assist with Condition Assessment
IRA to assist with Condition Assessment
INSTALLATION OF APPROXIMATELY +/-536LF - 12'W x 14'H and +/- 176 LF - 12'W x 20'H TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS, FOR EXTERIOR FACADE REPAIR WORK. NO CHANGE IN USE, EGRESS OR OCCUPANC...
Plumbing work at retail space on the first floor. no change of use, egrees or occuapncy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation of a Type 2 hood
Interior renovation to partial cellar and 1st Floor Apogee Space as per plans. No change in use egress or occupancy.
modification & additions to existing 1st floor hvac systems and new cellar commercial cooling and hood exhaust systems as indicated on plans.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of a temporary wood fence 12 feet high; on the sidewalk, as per plans
Renovation to tenant spaces at Cellar-1st Floor-12th Floor and Roof as per plans.
Modification to & additions to mechanical systems as per plans.
Filing for the interior demo of an existing commercial space at floors 1 thru 3, mezzanine. Work includes removal of interior non load bearing partitions, finish work. No change to use, egress, or occ...
Installation of AC units taking place on the roof as indicated on the drawings.
Installation of one split heat pump system ac units for 1st floor commerical space.
Application file to exterior facade repair as stucco work in front of building. no change in use, egress or occupancy under this application.
Structural work for roof pergola and deck as per plans. no change of use, egress or occupancy under this application.
Application file to exterior facade repair as stucco work in front of building. no change in use, egress or occupancy under this application.
Installation of AC units taking place on the roof as indicated on the drawings.
Filing for the interior demo of an existing commercial space at floors 1 thru 3, mezzanine. Work includes removal of interior non load bearing partitions, finish work. No change to use, egress, or occ...