Erect illuminated accessory business sign on wall reading chase logo.
Filing for FISP Cycle 9B masonry facade repairs, as per plans filed herewith. No change in use, egress, or occupancy.
Theexisting exterior doors are to be replaced andthe outer vestibule is to be enclosed as per the drawings filed herewith. No change in use, egress, or occupancy.
Facade repairs no change in use egress or occupancy
Mechanical work for proposed alteration as per plans filed.
Support of Excavation as per plans filed.
Installation of temporary needle beam as per plan. no change in use,egress or occupancy
Filing to install six (6) below grade reinforced cast-place and precast structures. Scope includes excavation and backfill, placing steel reinforcement, placing and curing cast-in-place concrete and s...
Install fire sprinkler system as per plans.
Proposed Alteration for the Mechanical work in conjunction with general GC DOB#M0113989-I1 for the renovation of a residential unit on the 5th Floor of a 6-story mixed-use building. No change in use,...
Underpinning work as per plans filed.
Interior renovation to include demolition of existing and construction of new partitions in suite 1610 for existing office space. No change in use, egress, or occupancy.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 codeno change in use, egress, or occupancy under this application. the sidewalk shed at broo...
Plumbing work as per proposed plans submitted.
Modifications of existing plumbing and sprinkler systems to include fixture and sprinkler head installation. no change to use, occupancy or egress
Mechanical modifications of the existing system. Associated ducts and piping, and relocation of the existing AC unit. No change to use, egress or occupancy.
Contractor to install six (6) below grade reinforced cast-place and precast structures. Scope includes excavation and backfill, placing steel reinforcement, placing and curing cast-in-place concrete a...
Providing exhaust air in the underground electrical vault, interlocked with the light switch, to purge 6 air changes per hour (ACH) upon entry to the vault. Dehumidification and heating will be provid...
Installation of temporary construction plywood fence as per plan. no change in use, egress or occupancy.
Install fire sprinkler system as per plans.