Building Permits in ZIP 10013
Manhattan, NY — 1,006 permits filed recently
1,006 permits
Construction equipment - scaffold proposed installation of pipe scaffold for remedial repairs as per plans. pipe scaffold shall comply with chapter#33 of 2014 the ny building code. no change in use oc...
Filing for interior demo of 24th & 25th floor offices as per plans submitted herewith. no change to use, egress, or occupancy.
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado
Installation of split hvac mechanical system within existing apartment unit 5d & new rooftop condenser. no change in use, egress or occupancy.
Filing for mechanical work associated with interior demo of 24th & 25th floor offices as per plans submitted herewith. no change to use, egress, or occupancy.
Filing for plumbing and sprinkler work as per plans submitted herewith. no change to use, egress, or occupancy.
modification of existing sprinkler systems. no change in use to egress or exits under this appliactaion.
Structural modifications taking place on the 6th & 7th floors as indicated on the drawings.
Installation of temporary fire escape protection & netting as per plan. no change in use,egress or occupancy.
Interior and exterior renovation of retail stores as per plans filed herewith
Installation of temporary roof protection per plan. no change in use, egress, or occupancy. the roof protection on the north west and south west neighbor roof.
Subsequent mechanical filing for duct work at the 1st floor commercial space. no change in use, egress or occupancy.
modification of existing sprinkler systems. no change in use to egress or exits under this appliactaion.
Interior and exterior renovation of retail stores as per plans filed herewith
Structural modifications taking place on the 6th & 7th floors as indicated on the drawings.
Installation of temporary fire escape protection & netting as per plan. no change in use,egress or occupancy.
Subsequent mechanical filing for duct work at the 1st floor commercial space. no change in use, egress or occupancy.
Installation of temporary roof protection per plan. no change in use, egress, or occupancy. the roof protection on the north west and south west neighbor roof.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
ALTERATION TO RENOVATE THE EXISTING 6th FLOOR OFFICE SPACE UNIT 604. EXISTING USE GROUP 6B. NEW PLUMBING FIXTURES IN PROPOSED PRIVATE RESTROOM WITH SHOWER AND FINISHES. NO CHANGE IN USE, OCCUPANCY OR...