Building Permits in ZIP 10013
Manhattan, NY — 1,006 permits filed recently
1,006 permits
Mechanical modifications to commercial space as per plans. no change to use, egress or occupancy.
9TH Cycle FISP Repair. No Change to Use, Occupancy or Egress.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at mott street and brommer street elevations.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Alteration and Interior Renovation of an Existing Commercial Unit at the 1st Floor, as per Plans. Removal and Reconfiguration of the existing mechanical ductwork. Mechanical equipment shall remain. No...
Minor interior renovation including new glass partition wall & install one (1) new indoor a/c unit on 2nd floor existing office space. no change in use, occupancy, egress and structure under this appl...
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at mott street and brommer street elevations.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Minor interior renovation including new glass partition wall & install one (1) new indoor a/c unit on 2nd floor existing office space. no change in use, occupancy, egress and structure under this appl...
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Outriggers system installation and material hoist for Facade repairs. No change in use, egress. or occupancy under this application.
Interior renovation of first floor retail
Sprinkler/Standpipe system in conjunction with New Building M08022114-I1.
#8902 - Minor Architectural modifications to change designation of Second Floor to Mezzanine and change use to retail.
Garage repairs as per plans filed herewith. no change to use, egress or occupancy.
Alteration and Interior Renovation of an Existing Commercial Unit at the 1st Floor, as per Plans. Removal and Reconfiguration of the existing mechanical ductwork. Mechanical equipment shall remain. No...
Interior renovation store on 1st floor of existing 6 story building. construction work as per plan. no change in egress, use or occupancy.
Interior renovation of exiting 16th & 17th floor apartment. architectural, structural, mechanical and plumbing work . no change in use, occupancy, or egress.