Building Permits in ZIP 10013
Manhattan, NY — 1,006 permits filed recently
1,006 permits
Filing for interior renovation of 17th floor office as per plans submitted herewith. no change to use, egress, or occupancy.
Replace existing defective wood joists to match existing at the 2nd floor. no change in use, egress, or occuapncy under this filing.
INTERIOR RENOVATION OF THE PENHOUSE ON 16th and 17th FLOOR IN AN EXISTING BUILDING. NO CHANGE IN USE OCCUPANCY OR EGRESS
Herewith filing for modifications to existing Howard Street entrance, interior removals of non-load bearing partitions, interior fit out and replacement of existing awning. No change in use, occupancy...
Cap & remove existing plumbing fixtures. Installing new plumbing on new roughing.
Renovation of commercial space (frame.) installation of new interior partitions and ceilings, new fixtures,furnture and doors. remove bathroom on 1st floor. new accessible toilet in cellar. new ductwo...
Filing for interior renovation of 17th floor office as per plans submitted herewith. no change to use, egress, or occupancy.
Interior renovation of the existing retail store. no change in use, egress and occupancy
Filing for mecahnical work associated with 17th floor tenant improvement project as per plans submitted herewith.
Plumbing & sprinkler work in conjunction with ground floor retail interior upgrades for alteration type 2. work limited to interior retail work only on approximately 1,100 gsf of impacted retail area.
Interior renovation of exiting 16th & 17th floor apartment. architectural, structural, mechanical, and plumbing work. no change in use, occupancy, or egress.
The sidewalk shed at gradn street and west broadway elevations. installation of temporary custom color sidewalk shed as per plan. no change in use, egress ,or occupancy.
Plumbing & sprinkler work in conjunction with ground floor retail interior upgrades for alteration type 2. work limited to interior retail work only on approximately 1,100 gsf of impacted retail area.
Interior renovation of the existing retail store. no change in use, egress and occupancy
Interior renovation of exiting 16th & 17th floor apartment. architectural, structural, mechanical, and plumbing work. no change in use, occupancy, or egress.
Application filed for interior ducts and piping as shown on plans. VRF condensing unit filed separately.
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes, chapter 33. no change in use, egress or occupancy.
Mechanical work to include new VRF system as shown on plans
Application filed for interior renovation as shown on plans.
Application filed for interior ducts and piping as shown on plans. VRF condensing unit filed separately.