Building Permits in ZIP 10013
Manhattan, NY — 1,015 permits filed recently
1,015 permits
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022building codes, chapter 33. no change in use, egress or occupancy
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Sprinkler work as shown on filed plans
Propose mechanical work, installation of kitchen exhaust hood at existing commercial space of eating and drinking establishment as per plan. No change in use, egress, or occupancy.
Facade Repair: Exterior brick replacement, mortar joint repointing, repair of cracks in concrete surface, replace deteriorated caulk, minor crack repair and CMU replacement on the Facade as per plans...
Mechanical work for the commercial space on 1st floor.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Facade Repair: Exterior brick replacement, mortar joint repointing, repair of cracks in concrete surface, replace deteriorated caulk, minor crack repair and CMU replacement on the Facade as per plans...
Propose mechanical work, installation of kitchen exhaust hood at existing commercial space of eating and drinking establishment as per plan. No change in use, egress, or occupancy.
Mechanical work for the commercial space on 1st floor.
Legalization of work performed at the cellar & 1st floor commercial space as shown on plans submitted herewith. This application shall replace prior application #140718356, 121416182, 120027167, which...
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Sprinkler work as shown on filed plans
Mechanical work in conjunction with NB M08022114-I1
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022building codes, chapter 33. no change in use, egress or occupancy
Installation of suspended scaffold for facade work or inspection Amend #1, added hoist
Proposed facade repair as per plan. No changes to egress, occupancy and use.
Architectural modifications taking place on the 8th floor as per plans filed herewith. No change in use, egress or occupancy.
Foundational modifciations as per plans filed herewith.