Installation of a temporary roof protection as per plans during new building construction. no change in use, egress or occupancy. roof protection to comply with 2022 nyc building code, chapter 33.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed on the highline (west) elevation west 13rd street elevation.
Installation of temporary debris chute as per plans. no change in use, egress or occupancy.
Filing for facade repair for floors 001-012 as per plans filed herewith. no change in egress, use or occupancy.
Installation of a medium duty pipe scaffold as per plans in conjunction with nb construction. no change in use, egress or occupancy. pipe scaffold shall comply with 2022 nyc building code,chapter 33.
Exterior masonry repairs and replacement. concrete balcony repairs and steel lintel replacement.
Exterior masonry restoration, roof replacements, installation of new green roofing, skylight replacement, replacement of existing exterior door, repair of decorative steel elements, refurbishment
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application
Demolition and construction as required to combine Coop Apt.1 at basement and cellar with Coop Apt.2 at 1st Floor. Removal of 1 kitchen. No change to Use Egress or Occupancy. No change to C of O requi...
Install new LVL framing for new stair opening. Shore, cut and reattached existing wood joists to new LVL header.
Installation of suspended scaffold for facade inspection/repair.
Modifications to the existing Sprinkler System: Install (1) new head on 2, 3, 5 & 15th Floors; (17) new heads on 6, 9 & 10th Floors; (18) new heads on the 12th Floor and associated sprinkler piping as...
Application filed to replace lavatory and toilet in existing bathroom on existing rough and install hand sink as per plans. no change to the use, occupancy, or egress under this application.
Plumbing work in conjunction with alt-co filing
Sprinkler work in conjunction with alt-co application
Installation of suspended scaffold for facade work or inspection
Exterior masonry repairs and replacement. concrete balcony repairs and steel lintel replacement.
Installation of industrial rope access for facade inspections.
Installation of 300 psf sidewalk shed and pipe scaffold as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.