Building Permits in ZIP 10014
Manhattan, NY — 1,104 permits filed recently
1,104 permits
It is proposed to remove kitchen hood, ducts on 1FL, exhaust fan, split AC unit on lower roof and unit inside former pizza store as per ECB # 35250116L..CPP paid for ECB 35250116L under invoice 621654...
Plumbing work as per plans filed herewith.
Herewith filed for minor plumbing work in apartement 3f.
Installation of suspended scaffold for facade repair & inspection.
New stairway opening between first floor and cellar framing elevations as per plans filed herewith. no change in use, egress, or occupancy.
Interior renovation of (1) existing residential unit in a walk-up co-op building.remove and install partitions, remodel the existing kitchen and bathroom. add a window to exterior facade. no change to...
Installation of temp pergola, no alt to exist structures for seasonal La Plaz on outdoor plaza. TPA required. Producer is responsible to monitor site safety & implement HWAP. All production equipment...
Proposed mechanical work associated with the gc job. install ductless mini split air conditioning units. no change to use, occupancy or egress.
Plumbing work associated with installation of 2 boilers and indirect water heater. no change to use, occupancy, or egress.
Herewith filing shoring and sequencing steps means and methods to create new openings in between combined townhouses. Filed in conjunction with ALT CO# M01202184.
Herewith filing structural work to create new opening for skylight, and framing work at the roof level, as per plans submitted. There is no change to use, egress or occupancy.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Herewith filing roofing membrane and insulation replacement at main roof above existing roof sheathing. No change in use, occupancy or egress.
Herewith filing structural work in conjunction with ALT-CO M01202184, combination of two townhouses, new openings in between buildings.
Herewith filing alterations to an existing single family home. General Construction work, as per plans submitted. There is no change to use, egress or occupancy under this application.
Structural and foundation work in conjunction with the construction of new entry steps and sidewalk ramp. no change in use, occupancy, or egress.
Herewith filing general construction work for the removal of interior finished ceiling, framing and existing roof hatch door, as per plans submitted. There is no change to use, egress or occupancy und...
Herewith filing minor modification of supply and duct work, as per plans submitted. There is no change to use, egress or occupancy.
Combination of tax lots & two existing single-family residential townhouses. Exterior masonry, enlarged window masonry openings, interior masonry demolition to connect the existing townhouses, interio...
Herewith filing for the relocation of four (4) condensing units, and related piping, as per plans submitted. There is no change to the use, egress or occupancy