Building Permits in ZIP 10014
Manhattan, NY — 1,109 permits filed recently
1,109 permits
Structural steel framing for roof dunnage. no change to use, egress or occupancy.
Minor partition work with general carpentry. No change to use, bulk or egress
Interior white box fitout of existing commercial space. new non-loadbearing gwb partitions and finishes. no change in use, egress or occupancy.
General Construction work for interior retail renovations on ground floor as per plans filed herewith. No change to use, egress, or occupancy.
SOE in conjunction with M01041803.
To resolve ecb violation #35719386r by removing illegal shower and restoring mop sink of existing beauty salon on cellar floor as per plan filed herewith. no change of use, egress or certificate of oc...
Change of use and occupancy in cellar from warehouse (ug 16) to retail and business (ug vi). interior renovations in cellar. renovations to 1st floor loading dock and loading dock facade. filed in con...
Roof replacement as per plans filed herewith, no change to use, egress or occupancy
Existing sprinkler system to be modified with removal of existing sprinkler heads and addition of new sprinkler heads with related piping work. no change to use occupancy or egress.
Cellar Level Gas Piping Modifications
Interior and exterior renovations as per plans filed herewith, no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Mechanical work as per plans.
Mechanical work associated with the renovation of an existing penthouse apartment.
Mechanical work as per plans filed herewith.
Removal & installation of duffusers & associated ductwork, piping & accessories. instllation of fan coil units. all exisitng mechanical equipment, ductwork, piping & accessories to be removed as per p...
Interior and exterior renovations consisting of reinforcement of existing floor framing, installation of new floor framing at a different elevation, reconfiguration of masonry wall openings, installat...
Installation of a temporarily supported scaffold and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with...
Propose plumbing work as per drawings filed herewith.
Propose mechanical work as per drawings filed herewith.