Building Permits in ZIP 10016
Manhattan, NY — 1,059 permits filed recently
1,059 permits
Structural work as shown on plans filed herewith.
Interior renovation apt. 6s, (02) bathrooms replace existing shower body and plumbing fixtures at same locationas shown in plan. no change in egrees. no change in occupancy or use.
Proposed installation of temporary light duty pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this applicatio...
Renovation to existing space on 2nd floor. no change to use, occupancy or egress.
Plumbing work as shown on plans filed herewith.
Interior renovation of existing 1 family mixed use building. no change in use, egress or occupancy under this application
Nyu langone - science building 856 plumbing modifications - plumbing modifications as per plans filed herewith. no change in use, egress, or occupancy.
General construction for interior renovations of commercial office tenant spaces on floors 3, 9, and 14(C)/15(M), as shown on plans filed herewith. No change in use, egress or occupancy.
Interior renovation apt. 6s, 02 bathrooms, replace existing shower body and plumbing fixtures at same location as shown in plan. no change in egress. no change in occupancy or use
Mechanical work as shown on plans filed herewith.
General construction work as shown on plans.
Installation and use of temporary debris chute as per plans filed herewith. no change in use, egress, or occupancy.
Alt co to convert office and showroom on the 11th floor from use group 5 to yeshiva university katz school of medicine and health in use group iii(b) as per the plans filed herewith. all work performe...
NYU KIMMEL - Garage Infill. Temporary Sprinkler Loop. No change in Egress, Occupancy or Use.
Interior renovation of existing eating & drinking establishment. no change in use, egress, or occupancy.
Decommission of existing T-MOBILE site on the roof. No change in use, egress or occupancy.
NYU KIMMEL - Garage Infill. Temporary Sprinkler Loop. No change in Egress, Occupancy or Use.
Installation and use of temporary debris chute as per plans filed herewith. no change in use, egress, or occupancy.
Alt co to convert office and showroom on the 11th floor from use group 5 to yeshiva university katz school of medicine and health in use group iii(b) as per the plans filed herewith. all work performe...
Interior renovation of existing eating & drinking establishment. no change in use, egress, or occupancy.