Building Permits in ZIP 10016
Manhattan, NY — 1,066 permits filed recently
1,066 permits
Mechanical System modifications related to Restaurant Renovation.
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Construction build out of existing restaurant on 1st floor which is a white box, renovation includes demolition of existing non loading bearing partitions. a new restroom to be added as are new non-lo...
Application filed for sprinkler modifications/additions on the 4th floor as per plans filed herewith. no change in use, egress, or occupancy.
Office renovation work work to include partion, ceiling and door modifications to stairwell enclosure work as indicated on plans. no change in use, egress or occupancy,
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Facade Inspection via Industrial Rope Access
Mechanical modifications as indicated on plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Facade Inspection via Industrial Rope Access
Application filed for sprinkler modifications/additions on the 4th floor as per plans filed herewith. no change in use, egress, or occupancy.
Office renovation work work to include partion, ceiling and door modifications to stairwell enclosure work as indicated on plans. no change in use, egress or occupancy,
Mechanical modifications as indicated on plans. no change in use, egress or occupancy.
Plumbing and sprinkler systems installation as shown on plans filed herewith. no change in use, egress, or occupancy.
Boiler replacement and associated ducts and piping work as per plans filed herewith. no change in use, egress, or occupancy.
Herewith filing for interior renovations at the 16th flr infusion center per plans. no change in use, occupancy, or egress under this application.
.herewith filing for modifications to the mechanical system at the 16th flr infusion center as per plans. no change in use, occupancy, or egress under this application.
NYULH - ambulatory care centre Sprinkler renovation - Sprinkler modifications as shown on plans filed herewith. No change in egress, occupancy, or use.
Plumbing modifications for 16th floor commercial space
At first floor, modification to egress and egress door/facade assembly as per ccd1 #pda00004108. alternate egress only approved as temporary egress durng lobby renovation and is to be restored to orig...