Building Permits in ZIP 10017
Manhattan, NY — 1,018 permits filed recently
1,018 permits
General Construction for Interior renovation for retail space Whole Foods Market on the First floor. No change to occupancy, use or egress.
Mechanical modifications taking place on the 12th floor as per drawings filed herewith. no change in use, egress or occupancy.
Installation and use of temporary supported scaffold as per plans filed herewith. no change in use, egress, or occupancy.
General Construction for Interior renovation for retail space Whole Foods Market on the First floor. No change to occupancy, use or egress.
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD FOR FACADE INSPECTION & REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Dariusz Janczak
Herewith filing plumbing work in conjunction with interior renovations of office space as per plans. No change of Use, Egress or Occupancy is proposed under this application.
Removal and disposal of existing plumbing fixtures and associated piping as per plans. No change to use, egress or occupancy.
Structural changes for slab infill on the 24th floor construction (25th floor marketing) as indicated on drawings.
General renovation of apartment 23D. Minor layout changes, new finishes. Related plumbing work. No change to use, occupancy and egress.
General construction related to the installation of new chimney liner. no change in egress or occupancy.
Hereby filing to remove and install sprinkler heads with related piping for storefront modification as shown on plans filed herewith. No change to use, occupancy or egress.
Additions / Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
Mechanical changes as indicated on plans.
Installation of standpipe floor control valve for sprinkler installation 1st floor tenant space. no change in occupancy, use or egress.
Modifications to Existing Sprinkler System on Part of the 11th Floor
Modifications to Existing Sprinkler System on Part of the 11th Floor
Installation of standpipe floor control valve for sprinkler installation 1st floor tenant space. no change in occupancy, use or egress.
Mechanical changes as indicated on plans.
Removal and disposal of existing plumbing fixtures and associated piping as per plans. No change to use, egress or occupancy.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.