Building Permits in ZIP 10017
Manhattan, NY — 1,018 permits filed recently
1,018 permits
Hereby filing to modify ductwork and piping for bathroom renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of plumbing fixtures and associated piping on the 1st floor (Cala Scarpetta) as per plans. No change to use, egress or occupancy.
Job filed for apartment interior renovation with minor kitchen layout modifcations, plumbing fixture replacements in kind, replace lighting fixture, and finish upgrades. plumbing work filed in differe...
Plumbing/combine work in apartment 10de in conjunction with apt renovation in dob now job#m01325394. no change in use, egress or occupancy.
Filing herewith interior demolition and renovation on the 20th FL. as per plans filed herewith. No change to use, egress or occupancy.
Removal of plumbing fixtures on the 3rd floor, 23rd floor construction (24th floor marketing), 24th floor construction (25th floor marketing) as indicated on drawings.
Equipment use: dual 7000 # capacity personnel hoist during bldg alteration, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elev...
Equipment use: dual 7000 # capacity personnel hoist during bldg alteration, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elev...
Filing herewith interior demolition and renovation on the 20th FL. as per plans filed herewith. No change to use, egress or occupancy.
Installation of plumbing fixtures and associated piping on the 1st floor (Cala Scarpetta) as per plans. No change to use, egress or occupancy.
Job filed for apartment interior renovation with minor kitchen layout modifcations, plumbing fixture replacements in kind, replace lighting fixture, and finish upgrades. plumbing work filed in differe...
Use of mechanical demolition equipment during interior demo, filed separately under m01296642-i1.
Material hoist. materials only. no work from hoist.
Replacement of hvac units for existing office at 019 fl & penthouse. work includes removal of old cooling tower unit at penthouse and installation of new hvac (vrf) system at 019 fl as per plans herew...
1st fl. commercial establishment. erect minor interior partitions, new finishes thru-out, new hung ceiling. new plumbing, hvac filed separately. no change in egress, occupancy, or use filed under this...
Structural framing for new hung platform for water heaters and framing to support new hanging MEP units and kitchen equipment on the 1st floor (Cala Scarpetta) as per plans. No change to use, egress o...
Interior mechanical demolition on the 3rd floor, 23rd floor construction (24th floor marketing) and 24th floor construction (25th floor marketing) as indicated on drawings.
Modify sprinkler heads and related piping. No change in use, egress or occupancy.
Modify plumbing fixtures and related piping. No change in use, egress or occupancy.
Modify plumbing fixtures and related piping. No change in use, egress or occupancy.