Building Permits in ZIP 10017
Manhattan, NY — 1,026 permits filed recently
1,026 permits
Masonry facade work as per plans, including addressing the conditions cited in ECB Violation 35674111L and Violation 39083802L. No change to use, egress, or occupancy.
Demolition and Construction of Partitions, Doors, Millwork, Wall & Floor Finishes, Patch Existing Ceiling and Renovate Existing Pantry on Part of the 11th Floor. No Change to Occupancy, Use or Egress...
Filed herewith for Interior & Exterior renovation for the MTA Box. Construction of an entrance to the LIRR Grand Central Madison concourse. Installation of non load bearing partitions, ceilings, floor...
FACADE RESTORATION WORK, INSPECTION, (added scaffolds at new locations)
Additional repair locations added
Filing herewith drawings indicating interior renovation to unit 522. No change in use, egress or occupancy.
Demolition and Construction of Partitions, Doors, Millwork, Wall & Floor Finishes, Patch Existing Ceiling and Renovate Existing Pantry on Part of the 11th Floor. No Change to Occupancy, Use or Egress...
Partition work on the 29th floor to create place of assembly with increase of occupancy load on the 30th floor (Tradeweb) as per plans.
Proposed garage repairs as per plans submitted herewith. there is no change in use, egress of occupancy.
Interior alterations of 18th floor commercial space to include non-load bearing demo, partition and finishes work. no change to use, occupancy or egress
Interior renovations for dental office at 8th floor , no change to use, egress or occupancy
Filing herewith for below-grade basements and foundations work as per plans. The proposed work is previously approved under NB M00615380. This Application is being filed to separate MTA processing and...
Filed herewith for Interior & Exterior renovation for the MTA Box. Construction of an entrance to the LIRR Grand Central Madison concourse. Installation of non load bearing partitions, ceilings, floor...
Plumbing fixtures installations in conjunction with General Construction work under Initial Filing M00954652-I1 Subdivide apartment 6ABC into apartments 6A, 6B, and 6C to restore existing prior legal...
Installation of temporary suspended scaffold equipment.
Herewith Filing Structural Work in conjunction with interior renovations, work includes the installation of concrete pads and steel supports for Mechanical equipment and new convenience stair opening...
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Facade restoration, inspection
Minor Modifications to the Existing Air Conditioning Ductwork, Installation of Volume Dampers, Supply Air Registers, Return Air Grilles & Return Air Openings in Walls on Part of the 11th Floor
Installation of temporary shoring as per plans submitted herewith. there is no change in use, egress of occupancy.